According to Kyoto ProtocolSix gases are associated with the anthropogenic portion of greenhouse gases (GHGs), but three are responsible for 98% of the effects: CO2 or carbon dioxide (79%), CH4 or methane (14%) and N2O or nitrous oxide (5%). Only the information of these first three components is retained here. The other three gases are HFCs or hydrofluorocarbons, PFCs or perfluorinated hydrocarbons and finally SF6 or sulphur hexafluoride. For ease of comparison, all GHGs are reduced to the same equivalent, CO2 in kilotonnes (kt), depending on their «Global warming potential»According to a multiplier prepared by the IPCC (Intergovernmental Panel on Climate Change): 1 for CO2, 25 for CH4 and 298 for N2O.

Total GHG emissions

45 MtCO2eq

Projects monitored

120

Mitigation

34

Adaptation measures

28

Total GHG emissions

45 MtCO2eq

Projects monitored

120

Mitigation

34

Adaptation measures

28

Developments greenhouse gases (ktCO2e) in Burundi

YearAgricultureEnergyFATPIUPTotal
2005-7 818,08900,26180,3414,88-6 722,60
2023-1 694,12879,660,000,00-814,46

Detailed breakdown of needs by sector

Sector Action Total
Undefined Transversal 2 012 000 000,00
Undefined Mitigation 231 735 000,00
Undefined Adaptation 20 000 000,00
Undefined N/A 137 170 000,00
General total 2 400 905 000,00

Share of different sectors in greenhouse gas emissions

Changes in national GHG emissions in Eq-CO2 from 2005 to 2023

Mapping of mitigation/adaptation projects

Sector Project Budget Start End Status
+ Energy NYAKIRIZA Sun Project 65 000 000 2021-05-12 2028-03-31 Ongoing
+ Energy Umuco wiiterambere 16 052 000 2023-02-02 2024-12-23 Achieved
+ Energy Jiji Murembwe Central 320 400 000 2014-06-24 2025-12-25 Achieved
+ Energy Ruzibazi Central 70 700 000 2020-02-05 2027-05-22 Planned
+ Energy Energy Development Project (Endev) 38 900 000 2020-09-09 2026-01-30 Planned
+ Energy 5 hydropower plants (Mpanda 10.2 MW; 1.6 MW RUVVYI102; Mule037 of 9.0 MW; RUZIZI III of 206 MW including 68 MW for Burundi; and KIRASA of 16 MW) 2 711 458 2026-01-14 2026-01-14 Planned
+ Energy Installation of the Mubuga solar power plant (7.5 MW) 32 191 519 2026-01-14 2026-01-14 Achieved
+ Undefined Rehabilitation of natural landscapes and adaptation to climate change in the Mumirwa region of Bujumbura and Bujumbura City Hall through a peasant field-school approach 588 2026-01-14 2026-01-14 Planned
+ Undefined Burundi Landscape Restoration and Resilience Project (PRRPB) 106 2026-01-14 2026-01-14 Planned
+ Undefined Burundi Landscape Restoration and Resilience Project (PRRPB) 106 000 000 2019-04-01 2026-09-30 Planned
+ Undefined Investments in climate-proof food production in the Imbo and Moso basins in the Republic of Burundi 99 900 000 2019-12-02 2026-11-30 Planned
+ Undefined PRODER (rural entrepreneurship development programme) 83 300 000 2018-01-01 2025-12-31 Planned
+ Undefined PRDAIGL (Regional Integrated Agriculture Programme in the Great Lakes Region from late 2023 extended to 2025) 75 000 000 2019-01-10 2027-01-31 Planned
+ Undefined Medium grant project to support management efficiency improvement and community development initiative 182 000 2019-04-01 2025-03-31 Planned
+ Undefined Support for sustainable food production and improved food security and climate resilience in the uplands of Burundi 64 000 000 2020-01-01 2027-01-31 Planned
+ Undefined VOCID project 19 65 000 000 2019-07-01 2027-02-28 Planned
+ FAT Community-based disaster risk management in Burundi 8 072 000 2018-07-02 2025-12-31 Planned
+ FAT Building capacity in Burundi to implement the enhanced transparency framework under the Paris Agreement (BIT) 1 228 000 2023-01-07 2025-12-31 Ongoing
+ Undefined Biennial Transparency Report (BTR) 600 000 2018-08-01 2026-01-31 Planned
+ Undefined National communication project 842 000 2020-04-01 2025-12-31 Planned
+ Energy ASCENT project 169 000 000 2026-03-17 2030-02-17 Ongoing
+ Energy Medium electricity extension project 1 000 000 2026-02-25 2029-05-31 Planned
+ Waste Circular ecomony project in Bujumbura Town Hall 2 120 000 2026-06-17 2027-02-17 Planned
+ PIUP Production Technology Promotion Project More Cleaner 2 000 000 2026-07-01 2028-07-01 Planned
+ Waste PROPOSED VALORIZATION OF BUTTERERE EPRATION STATION VIDANGES 800 2026-02-17 2026-02-17 Planned
+ FAT Restoration of landscapes for improving climate resilience in urban and peri-urban areas of Bujumbura 25 900 000 2026-02-17 2026-02-17 Ongoing
+ Agriculture Fruit plant propagation project 3 000 2026-03-02 2026-03-06 Planned
+ PIUP Industrial effluent management project for reuse 2 758 356 2026-07-02 2030-07-02 Planned
+ FAT TRANSITION TO METALLIC ECHAFFAUDAGES FOR CONSTRUCTION RESILIENT TO BURUNDI 1 000 000 2026-02-17 2026-02-17 Planned
+ Agriculture Improvement of animal feed 10 000 2030-02-25 2035-05-17 Planned
+ Waste National Incinerator Inventory Project (PIN) 150 000 2026-03-15 2029-03-18 Planned
+ FAT Capacity building of the BTR2 project office by providing internet connection and back up 300 000 2026-02-25 2028-12-26 Planned
+ Waste Organic compost coffee park development project at Kiyago station (Muramvya commune) 2 000 000 2027-02-02 2029-02-05 Planned
+ Agriculture Promotion of SRI System in Rice farming (SRP) 8 000 000 2027-02-17 2030-02-17 Planned
+ FAT Rehabilitation of quarry sites through reforestation 100 000 2026-02-17 2031-02-17 Ongoing
+ Waste Connecting households to sewers 500 000 2025-02-11 2029-06-17 Ongoing
+ Energy promotion of solar energy 0 2026-02-17 2026-02-17 Ongoing
+ Energy Rural electricity by solar energy 5 000 000 2027-03-16 2037-03-16 Planned
+ Energy Improved household distribution 125 000 000 2021-05-02 2028-05-31 Ongoing
+ Energy NFDD 20 000 2026-06-09 2032-06-09 Planned
+ Energy Distribution of 20,000 improved households in rural households in Nyabiba municipality 3 2026-06-09 2032-06-09 Planned
+ FAT Community reforestation project 145 007 2026-03-18 2028-03-18 Planned
+ FAT Community reforestation project 300 000 2026-02-18 2027-02-18 Planned
+ Agriculture ICT/ADAPTATION AND ATTENTION TO CC 20 000 2026-02-19 2027-02-19 Planned
+ FAT Updating the framework and politics 1 000 000 2026-02-20 2026-08-20 Planned
+ Agriculture Valorization of plant debris in organic fume in Kiyago 100 000 2027-08-16 2026-08-17 Planned
+ Energy distribution of 20 solar pumps to 20 associations of the municipality Karuzi, province Gitega 200 000 2030-02-04 2035-02-05 Planned
+ FAT Project to restore 20,000 ha of degraded land 20 000 2030-02-01 2035-12-31 Planned
+ PIUP Awareness of the abandonment of wood boilers in theatrical complexes 24 000 000 2027-02-01 2031-02-01 Planned
+ PIUP Project for collection and recycling of plastic moulds 450 000 2026-02-20 2026-02-20 Planned
+ Energy Installation of the thermal power plant based on solid waste 100 000 000 2027-02-20 2030-02-20 Planned
+ Undefined Connecting to an Internet Network 90 000 2028-07-20 2030-12-30 Planned
+ FAT Urban reforestation 850 000 2026-06-01 2028-06-01 Planned
+ Undefined Promotion of the production of organo-mineral fertilizers 100 000 000 2027-02-20 2031-01-01 Planned
+ Waste Development of sludge and organic waste by production of biogas 30 000 000 2030-02-20 2035-02-20 Planned
+ FAT Restoration of Ruvubu National Park 300 000 2026-02-20 2030-02-20 Planned
+ FAT Restoration of Mpungwe Denuded Creests 1 500 000 2028-02-20 2032-02-20 Planned
+ Waste Value of household waste in briquettes 500 000 2026-02-20 2031-02-20 Planned
+ Waste Biological treatment of solid waste 200 000 2026-02-20 2028-02-20 Planned